June 2020

ACMA

Looking into the commons area and second floor level at ACMA.

Work Completed

  • South and east side Masonry
  • Lower roof
  • Roof vapor barrier
  • Temporary roofing

Work Underway

  • Irrigation sleeves
  • Windows
  • Electrical wiring
  • Plumbing rough-in
  • Drywall
  • Upper roof coverboard

Substantial Completion: August 2021

General Contractor: Robinson Construction
Architect: DLR Group