High/Option School Projects

High Schools

Aloha

AHS/SHS Title IX

Visit the project page for more information.

Auditorium & Stage Upgrades

Install new code compliant thrust and black box theater stage and riser systems. Reconfigure side stage lighting positions and access ladders for safer student access. Install new aisle lighting. New stage lighting panels and phase 2 safety upgrades. Install new theatrical production, architectural and work lighting systems throughout. Install various safety modifications to railings in existing catwalks and grid levels. 
Budget: $2,487,000.00
Funding: 2014 Bond
Schedule: 06/2018 - 09/2019
Status: In Progress

Auto Tech Program Renovation

Renovation of the Auto Tech area in support of the Career and Technical Education (CTE) program.
Budget: $1,650,000.00
Funding: Measure 98
Schedule: 02/2019 - 08/2019
Status: In Progress

2017 Career & Technical Education Renovations 

Renovation of the Computer Science, Drafting, Construction, Business and Marketing, and Film areas in support of the Career and Technical Education (CTE) program.
Final Cost: $2,663,300.00
Funding: Measure 98
Schedule: 06/2017 - 09/2017
Status: Complete

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Title IX

New concession stand and press box at the softball field.
Final Cost: $277,300.00
Funding: 2014 Bond
Schedule: 2016
Status: Complete

District-Wide Unified Communication System

Visit the project page for more information.

Seismic Upgrades

Visit the project page for more information.

Synthetic Turf Replacement

Main stadium synthetic turf replacement.
Final Cost: $814,500.00
Funding: 2014 Bond
Schedule: 05/2015 - 08/2015
Status: Complete

Other 2014 Bond Projects

Building doors and hardware upgrades; replace backstop netting; repair and resurface tennis courts; drop ceiling repairs.

Beaverton

Auditorium & Stage Upgrades

Resurface main performance stage. Install new code compliant thrust stage system. Reconfigure side stage lighting positions and access ladders for safer student access. Install new aisle lighting. Install new theatrical production, architectural and work lighting systems throughout. Install various safety modifications to railings in existing catwalks and grid levels.
Budget: $1,086,000.00
Funding: 2014 Bond
Schedule: 06/2017 - 09/2019
Status: In Progress

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Unified Communication System

Visit the project page for more information.

Field Concession Stand Addition

Design and construction of new concessions facility and restrooms near the "Home" bleachers section. 
Budget: $1,400,000.00
Funding: Donor
Schedule: 01/2019 - 08/2019
Status: In Progress

Gym Roof/Ceiling Repairs - Emergency Project

Repair/replacement of failing trusses in gym ceiling. New ceiling tiles, lighting and floor refinishing.
Final Cost: $1,377,300.00
Funding: 2014 Bond
Schedule: 05/2018 - 09/2018
Status: Complete

Health Clinic

Renovation of approximately 2,560 square feet (2 classrooms) within the Annex building west of the main campus to house the Beaverton School-Based Health Center. This clinic, run by Virginia Garcia Memorial Health Center, provides care for children between the age of 4 and 20 who live within the Beaverton School District boundaries. 
Final Cost: $570,800.00
Funding: Grant
Schedule: Fall 2014
Status: Complete

HVAC System Upgrades

Upgrade HVAC and lighting systems in eastern classrooms, library and media center.
Final Cost: $3,900,000.00
Funding: 2014 Bond
Schedule: 06/2017 - 09/2017
Status: Complete

Merle Davies Field Grading & Irrigation 

Regrading of field, eliminating softball infield and installing irrigation system. 
Final Cost: $115,400.00
Funding: 2014 Bond
Schedule: 01/2017 - 05/2017
Status: Complete

Seismic Upgrades

Visit the project page for more information.

West Annex Roof Replacement

Install a new roof overlay system.
Final Cost: $198,400.00
Funding: 2014 Bond
Schedule: 07/2017 - 09/2017
Status: Complete

Other 2014 Bond Projects

Building doors and hardware upgrades; replace backstop netting; replace boiler; remove hazardous tree in 2nd Street parking lot.

Mountainside

New Building 

Visit the project page for more information.

Southridge

Auditorium & Stage Upgrades

Enhance safety to stage access ladders, railings in existing catwalks and grid levels.
Budget: $117,500.00
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
Status: In Progress

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Title IX

New dugouts at the softball field; enclose the baseball batting cage.
Final Cost: $248,900.00
Funding: 2014 Bond
Schedule: 2015
Status: Complete

District-Wide Unified Communication System

Visit the project page for more information.

Sports Fields Irrigation & Drainage Improvements

Install irrigation and drainage for baseball field improvements. 
Final Cost: $208,000.00
Funding: 2014 Bond
Schedule: 11/2015 - 06/2017
Status: Complete

Other 2014 Bond Projects

Building doors and hardware upgrades.

Sunset

AHS/SHS Title IX

Visit the project page for more information.

Auditorium & Stage Upgrades 

Work at Sunset begins as an emergency declaration for lighting upgrades to address safety concerns. Install new theatrical production, architectural and work lighting systems throughout. Resurface main performance stage. Install new code compliant thrust stage system. Reconfigure side stage lighting positions and access ladders for safer student access. Install new aisle lighting. Install various safety modifications to railings in existing catwalks. Reconfigure sound control booth to allow additional path of egress from catwalks.
Budget: $1,987,000.00
Funding: 2014 Bond
Schedule: 06/2015 - 09/2019
Status: In Progress

Building Intercom & Clock System Replacement

Replace failing clock and public address (PA) systems.
Final Cost: $461,200.00
Funding: 2014 Bond
Schedule: 06/2016 - 12/2018
Status: Complete

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Unified Communication System

Visit the project page for more information.

Flagpole Addition 

Install a 45 ft. flagpole for flying three flags - USA, State of Oregon, and Prisoner of War (POW).  Mount low-voltage light to illuminate the flags.
Budget: $35,000.00
Funding: Donor
Schedule: Summer 2019
Status: In Progress

Multi-Functional Synthetic Athletic Fields

Construct new multi-functional synthetic turf athletic field.
Final Cost: $4,647,500.00
Funding: Donor
Schedule: 2014 - 2015
Status: Complete

Roof Replacement

New roof to replace outdated one. 
Final Cost: $5,126,100.00
Funding: 2014 Bond
Schedule: 06/2014 - 08/2014
Status: Complete

Stadium Site Improvements

Remove existing baseball bleacher sets to install hardscaping, then reinstall with proper attachment. New decorative stadium gates and north perimeter fencing along with area landscape enhancements to be installed. 
Budget: $850,000.00
Funding: Donor
Schedule: 06/2019 - 08/2019
Status: In Progress

Synthetic Turf Replacement

Replace stadium field sub-grade, drainage and artificial turf.  
Final Cost: $1,243,800.00
Funding: 2014 Bond
Schedule: 06/2015 - 08/2015
Status: Complete

Other 2014 Bond Projects

Building doors and hardware upgrades; replace air conditioning chiller in library.

Westview

Auditorium & Stage Upgrades

Install various safety modifications to railings in existing catwalks and stage access ladders. Add a code compliant storage area in catwalk.
Budget: $60,700.00
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
Status: In Progress

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Title IX

Improvements to the softball and baseball concessions.  New softball scoreboards. New softball dugouts and press box.  Enclose the softball batting cage.
Final Cost: $504,500.00
Funding: 2014 Bond
Schedule: 2015
Status: Complete

District-Wide Unified Communication System

Visit the project page for more information.

Flooring Repairs

Replace VCT flooring in the student center. 
Final Cost: $159,500.00
Funding: 2014 Bond
Schedule: 06/2017 - 09/2017
Status: Complete

Roof Replacement

Re-roof by overlay of existing roofing in a phased project over two years.   
Final Cost: $4,476,700.00
Funding: 2014 Bond
Schedule: 06/2017 - 11/2018
Status: Complete

Other 2014 Bond Projects

Building doors and hardware upgrades; repair portable classroom partition walls; sports fields irrigation improvements; carpet replacement in portables.

Option Schools

Arts & Communication Magnet Academy (ACMA)

Building Replacement 

Visit the project page for more information.

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Unified Communication System

Visit the project page for more information.

Capital Center: Health & Science School (HS2) / School of Science & Technology (SST)

Capital Center Improvements & Data Center

Visit the project page for more information.

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Unified Communication System

Visit the project page for more information.

Flooring Repairs

Convert all hallways to polished concrete. Replace flooring in 27 classrooms and 4 offices. 
Final Cost: $521,000.00
Funding: 2014 Bond
Schedule: 06/2017 - 09/2018
Status: Complete

Other 2014 Bond Projects

Building doors and hardware upgrades; fire alarm; renovate seclusion room.

 

International School of Beaverton (ISB)

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Unified Communication System

Visit the project page for more information.

Gym Truss Repair

Repair of three wood trusses in gym showing visible signs of cracking.
Budget: $140,000.00
Funding: 2014 Bond
Schedule: 06/2019 - 08/2019
Status: In Progress

Other 2014 Bond Projects

Building doors and hardware upgrades; replace carpet and rubber cove base in three portable buildings.

 

 

Merlo Station Community High School

Commercial Construction Trade Program

Conversion of three existing classrooms, loading dock and miscellaneous storage areas into one Career Technical Education (CTE) program classroom/workshop space. The vocational lab space will provide hands-on training for various commercial construction trades. Mock-up walls etc. will allow students to learn installation of electrical, mechanical and plumbing systems in addition to framing and drywall installation. Exterior spaces will provide expansion of the program allowing additional options for students to learn foundation forming/pouring, small structure framing and utility trenching/placement.
Budget: $1,000,000.00
Funding: Measure 98
Schedule: 04/2019 - 09/2020
Status: In Progress

District-Wide Interior Classroom Locks

Visit the project page for more information.

District-Wide Security Upgrades

Visit the project page for more information.

District-Wide Unified Communication System

Visit the project page for more information.

Heating/Cooling System & Controls Replacement

Replacement of all rooftop HVAC systems and associated equipment, including upgraded building HVAC controls throughout. 
Final Cost: $2,037,000.00
Funding: 2014 Bond
Schedule: 06/2018 - 09/2018
Status: Complete

Roof Replacement 

Install a completely new roofing system, new access stairway and safety tie-offs. 
Final Cost: $4,409,500.00
Funding: 2014 Bond
Schedule: 06/2018 - 09/2018
Status: Complete

Other 2014 Bond Projects

Building doors and hardware upgrades; replace failing clock system; remove trees damaging the parking lot and repair pavement.