Work Completed: 

  • Roofing and skylights
  • Paving at covered play area and Lynnfield Ln.
  • Exterior stairs
  • Permanent power connection

Work Underway:

  • Roof for the covered play area
  • HVAC rooftop units
  • Siding installation
  • Exterior windows
  • Elevator installation
  • Drywall installation and painting
  • Ceiling grid, lighting fixtures and sprinklers
  • Tiling and flooring
  • Door and blinds
  • Concrete polishing
  • Casework
  • Fending and hardscape
  • Grading at West parking lots
  • Sidewalk, gutter and landscaping on Lynnfield Ln.
 

Substantial Completion: August 2019

General Contractor: Kirby Nagelhout