Skip Ribbon Commands
Skip to main content



The new Vose Elementary School opened its doors in September 2017. Vose students and staff spent the 2016-2017 school year in a temporary school in the Timberland area, while their school was demolished and rebuilt.

Vose was designed as a prototype school by DLR Group Architects. Sato, Hazeldale and William Walker elementary schools will all have the same design.

The new Vose has a capacity of 750 students. The 87,200-square foot school includes 32 classrooms, 9 additional teaching spaces, a stage, teaching area in the library and a dividable gym. The school was built by Triplett Wellman.

Visitors to the new school may wonder what happened to the two giant sequoia trees that stood in front of the old building. Those trees were cut down to align the school's new main entrance drive to King Blvd. The wood from the trees was repurposed and used for several artistic and functional items in the new school.


Webcam: View the project at Vose Elementary School. Select Desktop or Mobile below the real-time image to begin.
You can press play and watch from day 1 (August 3, 2016)  to today. Or select any specific day on the calendar. You can slow down play back speed on the left control panel. 

Construction Update (9/2017)
2016-2017 School Year at Vose at 118th FAQ

New Vose Flythrough Video